Yep, it’s finally tangible. No longer a sketch from my sketchpad.
I left QC at around 6 am and arrived in my hometown past 8 am. It was just around 1.5 hrs, minus a bathroom stop along the expressway.
I talked with my contractor the moment I arrived and discussed stuff for almost two hours. Placement of power outlets (like I have 24 power outlets, several two-way or four-way light switches), making platforms on the widows for the cats to watch the world go by, placement of my fridge, circuit breakers/fuse box, shower head, how the doors will open, range hoods, piped in LPG lines since the tanks will be left outside and just piped inside…so many things. Emergency exits, landing strips…
Will soon be closing off rooms from the other house since I will eat one entire room (my future bedroom).
I got scolded by my sister for keeping so much trash from high school. She told me to burn all of them because there’s no more space for my stuff.
Need to sleep now as I plan to walk several km tomorrow morning before I leave for BGC.
This is finally happening.